The grid has a queue. Your project has a date.

Charging plazas, islandable microgrids, and mobile substations — generation, storage, and switchgear staged on site so load energizes on a construction schedule while the permanent interconnection works its way through the utility.

Review a Site See delivery modes
DC Fast Charging · Islandable Microgrid · Mobile Substation · Battery Storage
2–5 yr typical wait for a large new service through the interconnection queue
150–350 kW per DC fast stall — a twelve-stall plaza is a small industrial service
8–16 wk to stand up staged power on site while the permanent service is built
4 delivery modes — utility service, microgrid, mobile substation, or a phased blend

Ranges are planning benchmarks — every site is sized on its own load profile, circuit, and permitting path.

01 — The Problem

Everyone has the capital. Nobody has the capacity.

Chargers are funded, fleets are ordered, and factories are leased — and all of it is stacked behind the same constraint: a distribution system that was not built for this load and a queue that does not care about anyone's delivery date.

The answer is rarely "wait." It is to stage power the site can own — and design the permanent service underneath it while the load is already running.

Fleet

Vehicles arriving next quarter, depot service sized for a warehouse, and a utility upgrade that lands two years after the lease on the diesel replacements ends.

Site host

Signed a charging deal on a parking field with no room for a pad, no spare panel capacity, and a service entrance on the wrong side of the property.

Campus

Critical process load that cannot ride through an outage, a generator permit that limits run hours, and no plan for what happens during a PSPS event.

Developer

A site plan approved on the assumption the utility would deliver — now holding a project whose critical path is a transformer with an eighteen-month lead time.

Lender

Funding an asset whose revenue starts at energization — and a schedule where energization is the only milestone the borrower does not control.

Staged power turns an open-ended queue into a date on the schedule.

02 — Delivery Modes

Four ways to get power to a site that cannot wait.

Most projects use more than one: mobile power first, microgrid for resilience, permanent service underneath — sequenced so each one is retired or absorbed by the next instead of stranded.

01

EV Charging Plazas

Depot, fleet, and public fast charging. Load profile and diversity modeling, service and transformer sizing, pad and cabinet siting, trench and conduit, make-ready design, and utility program paperwork.

L2 · DCFC 150–350kW · make-ready
02

Islandable Microgrids

Solar, storage, and generation behind one point of common coupling. Islanding and transfer schemes, protection and relay coordination, controls, and the interconnection agreement that lets it run parallel to the grid.

Rule 21 · PCC · island & resync
03

Mobile Substations & Staged Power

Skid and trailer-mounted transformation, switchgear, and generation stood up on site — bridging the gap until the permanent service lands, or carrying a temporary campus, event, or outage window on its own.

Skid · trailer · temp service
04

Interconnection & Utility Coordination

Load and generation applications, circuit capacity checks, study and upgrade negotiation, metering and telemetry requirements, and the persistent follow-through that keeps an application from sitting — the same utility discipline we run in Hard Tech and Rebuild.

05

Storage, Generation & Controls

Battery sizing against the real load curve, peak shaving and demand-charge strategy, generator and fuel permitting, fire code and setback compliance for storage, and the control layer that decides what runs when the grid is gone.

What we deliver

Load & capacity study Real duty cycles, coincident demand, existing service headroom, and what the serving circuit can actually give you.
System design & siting Single-lines, protection, pad and equipment layout, trench routing, and clearances that survive fire and utility review.
Interconnection & permits Applications, studies, agreements, incentive and make-ready programs, AHJ and fire submittals — tracked to approval.
Build, cutover & commissioning Staged energization, transition from mobile to permanent, witness testing, and handover to whoever operates it.

03 — Who We Serve

Different loads. Same question: when does it energize?

Fleets & Logistics

The trucks arrive whether or not the depot can charge them.

Depot load modeling against real duty cycles, phased charger deployment, and staged power that keeps the first vehicles running while the permanent service is built.

Model a depot →
Charging Operators & Hosts

Revenue starts at energization, not at award.

Site screening before the lease, make-ready and incentive program navigation, utility design and submittal, and construction through commissioning.

Screen a site →
Campuses & Critical Load

Resilience is an engineering scope, not a generator purchase.

Islandable design for data, fab, medical, and civic load — what stays up, for how long, on what, and how it resynchronizes when the grid returns.

Design a microgrid →
Developers & Capital

Underwrite the energization date, not the optimistic one.

Independent read on interconnection risk, upgrade cost exposure, incentive capture, and what staged power does to the revenue start date.

See the energization layer →

04 — Site Types

Three kinds of site. Three different constraints.

Southern California · LADWP & SCE territory

Depots & Yards

Overnight dwell · high diversity

The friendliest load shape in the practice — vehicles sit for hours, so managed charging can flatten a peak that would otherwise force a service upgrade. The fight is yard geometry, trench routing around operations, and phasing without shutting the yard down.

Retail & Corridors

Short dwell · peak coincident

Fast charging where dwell is twenty minutes and every stall wants full power at once. Storage carries the peak, the utility sees a smaller service, and the landlord keeps their parking count — if the pad, the setbacks, and the fire access all work.

Campuses & Critical Sites

Continuous load · must ride through

Fab, data, medical, and civic load where an outage is the event you are designing against. Islanding scheme, protection coordination, fuel and emissions permits, and an honest ride-through duration instead of a marketing number.

05 — The Energization Layer

The only number that matters is when the load turns on.

For every site we model the same thing: what the utility can deliver and when, what staged power costs to bridge the gap, and where the crossover sits. Sometimes waiting is right. Usually it is not.

Across a program it becomes a sequencing plan — which sites go first on utility service, which get mobile power, and which justify a microgrid on resilience alone.

Request an energization review
Energization plan · sample Q3 2026
Depot · 40 stalls · 3.2 MW Managed charging fits service Utility · Q1
Corridor DCFC · 12 stalls · 2.4 MW Storage carries peak Microgrid · Q2
Fab campus · 6 MW · critical Bridge to permanent service Mobile · 10 wk
Retail host · 8 stalls · 1.2 MW No pad location on site Re-site
Illustrative sample — not client data

06 — Field Work

Where energization slips, and what we change.

Fleet depot · Charging

The upgrade that turned out to be unnecessary

A depot was quoted a full service upgrade against nameplate charger capacity. We modeled the actual duty cycle — vehicles dwelling nine hours, never charging simultaneously — and showed the existing service could carry the fleet under managed charging with storage covering the morning overlap.

→ Chargers energized on the existing service instead of behind a two-year queue.

Industrial campus · Mobile

Production started before the transformer arrived

A campus needed load online months before the utility could deliver a permanent bank. We staged transformation and switchgear on skids, designed the permanent service to absorb the temporary gear rather than discard it, and sequenced the cutover into a single planned window.

→ Revenue-generating load ran through the entire utility lead time.

Critical facility · Microgrid

A resilience plan that could not actually island

A facility had solar, batteries, and a generator that could not run as a system — no islanding scheme, no protection coordination, no defined ride-through. We rebuilt the design around a real point of common coupling and a controls sequence, then took it through interconnection.

→ Equipment already on site finally behaved like a microgrid.

Charging program · Portfolio

Sequencing a program by what the circuits can take

An operator was deploying sites in the order the real estate closed. We screened each location on circuit headroom, pad feasibility, and program eligibility, then resequenced the rollout so the fast sites funded the slow ones.

→ Same capital, energized revenue pulled forward by quarters.

07 — The Ask

Electrification is not a vehicle problem. It is a distribution problem.

The projects that get built are the ones that stop treating the utility as a schedule assumption. We want to work with the fleets, operators, and capital willing to design around the queue instead of waiting in it.

Fleet & logistics operators Charging networks & CPOs Industrial & fab campuses Municipal & civic fleets Energy developers & IPPs Infrastructure capital
Open a conversation

08 — Contact

Tell us the site and the load.

Send the address, the existing service, and what has to run — vehicles, stalls, tools, or critical load. We come back with the delivery mode, the energization date, and what it costs to pull that date forward.

Email
Phone 310-448-1006
Address 15223 La Cruz Dr, Pacific Palisades, CA 90272
Service area Los Angeles · Orange County · Inland Empire
Site · Depot · Campus · Program

One site or a whole rollout.

You get a plain answer on all four modes — what the utility gives you and when, what a microgrid or mobile deployment costs to beat it, and which one your schedule and your capital actually want.

Review a Site → Reviewed by a consultant, not a bot