The deal that was priced before anyone opened the electrical room
A tenant wanted compute floors in a mid-rise with a house service sized for offices. The riser had no room for new busway and the roof could not carry the units the load required. We modeled the real demand, found the service and shaft path, and phased the buildout to the utility's delivery date instead of the lease date.
→ A scope and a date both sides could sign, instead of an LOI that would have died in month six.